
Builders-Assist Workshop
For those builders who prefer to finish their Pulsar airframe construction under factory supervision of our trained staff, we offer two seminars of two weeks duration each.
Work accomplished in a two week workshop:
Workshop I
Assuming a builder starts with a Fast-Build Kit, he will install all bulkheads and rudder floorboard. Center and aft consoles with elevator and ailerons controls / Install main landing gear / Occupant restraining structure / Engine mount brackets installed / Vertical stabilizer hinge point / Close one flap / install rudder pedal and cables / Construct horizontal stab. and elevator.
These tasks cover all construction techniques and skills you'll need in order to complete the kit with confidence at home.
Workshop II
Assemble elevator into fuselage / Install flaps and ailerons control tubes / Close wings / Close one aileron / Rudder constructed and installed / Install canopy.