FAST BUILD OPTIONS

BUILDER FRIENDLY

Pulsar aircraft kits were designed to be a  simple and fun  projects.  Most of our aircraft kits are being built and flown by customers with no prior aircraft construction experience. 

Even though construction of a Pulsar kitplane is simple and fun. There are still many customers who would rather fly than build. For this group, the Pulsar Fast-Build options has been developed.   

The Fast-Build options save up to 200 hours of construction time.

Most builders choose to start with Fast-Build option.

The factory completes the following scope of works when the fast build options are ordered.

 

PULSAR III

SUPER PULSAR100

SUPER CRUISER

PULSAR 150


 

PULSAR III

Fastbuild Scope of work

       Stage 1 - Fuselage

   F   Assembly/bonding of Left & Right Fuselage.

      Stage 1 - Wings:       

   F Assembly/bonding of the following molded parts in the factory wing jig to form the critical  wing shape:
                           
Q    Main Spar
                           
Q    Aft Spar
                           
Q    D-sections
                           
Q    Top wing skin
                           
Q    Wing ribs

   F Coating of wing fuel tanks with fuel and chemical resistant coatings.

   F     Installation of fuel vent lines.

            

       Stage 2 - Fuselage

            F   Installation of landing gear channel box.

            F    Installation of lower and upper seatback bulkhead.

            F    Installation of forward seat bulkhead.

            F    Installation of main spar bulkhead.

            F    Installation of seat gusset

            F    Installation of flap torque tube bearing

            F    Installation of forward & aft control stick torque tube bearing bulkhead

            F    Installation of forward & aft stick torque tube bearing

            F    Installation of forward floorboard tunnel.

 

       Notes:
                        1.     Fastbuild stage 1 is price as one for the fuselage and wings scope of works.
                        2.     Fastbuild stage 2 is price separately.
                        3.     Fastbuild stage 1 must be purchased first before opting for stage 2.
                        4.     There is no fastbuild stage 2 for the wings.

 


 

SUPER PULSAR 100   

Fastbuild Scope of work

        Stage 1 - Fuselage

            F   Assembly/bonding of Left & Right Fuselage.

            F    Assembly/bonding of vertical stabilizer aft spar to the Left & Right Fuselage.

      Stage 1 - Wings:       

               F Assembly/bonding of the following molded parts in the factory wing jig to form the critical  wing shape:
                           
Q    Main Spar
                           
Q    Aft Spar
                           
Q    D-sections
                           
Q    Top wing skin
                           
Q    Wing ribs

               F Coating of wing fuel tanks with fuel and chemical resistant coatings.

               F     Installation of fuel vent lines.

       Stage 2 - Fuselage

            F   Installation of landing gear channel box.

            F    Installation of lower and upper seatback bulkhead.

            F    Installation of forward seat bulkhead.

            F    Installation of main spar bulkhead.

            F    Installation of seat gusset

            F    Installation of flap torque tube bearing

            F    Installation of forward & aft control stick torque tube bearing bulkhead

            F    Installation of forward & aft stick torque tube bearing

            F    Installation of forward floorboard tunnel.

SP100 Fastbuild delivery using a 20 footer container.
(Note: Fuselage cradle is subject to availability)

wpe2.jpg (101974 bytes)

       Notes:   
                        1.     Fuselage & wings fastbuild stage 1 is price as one.
                        2.     Fastbuild stage 2 is price separately.
                        3.     Fastbuild stage 1 must be purchased first before opting for stage 2.
                        4.     There is no fastbuild stage 2 for the wings.

 


SUPER CRUISER

wpe3.jpg (36884 bytes)

wpe1.jpg (28356 bytes)

Fastbuild Scope of work

        Fuselage

            F   Pre-Alignment of Center Spar in the fuselage.

            F    Installation of Center Aft Spar.

            F   Installation of Landing gear channel box.

            F   Installation of Seat back bulkheads.

            F   Installation of Firewall.

            F   Installation of Engine Mount Hard points.

            F   Installation of Nose Gear hard points

            F   Assembly of center section spar.

            F   Installation of back seat bulkhead.

wpe3.jpg (28980 bytes)       

 

        Wings

   F   Alignment of outer main spars and center main spar section

   F    Installation of bushings for attach bolts.

   F Assembly/bonding of the following molded parts in the factory wing jig to form the critical  wing shape:
                           
Q    Outboard Main Spar
                           
Q    Outboard Aft Spar
                           
Q    Top wing skin
                           
Q    Wing ribs

   F    Installation of Fuel tank closeout spar.

   F    Installation of Ailerons bell crank assembly.

   F    Installation of Fuel caps.

wpe2.jpg (29370 bytes)


 

PULSAR  150

 

Fastbuild Scope of work

        Fuselage

            F   Pre-Alignment of Center Spar in the fuselage.

            F    Installation of Center Aft Spar.

            F   Installation of Landing gear channel box.

            F   Installation of Seat back bulkheads.

            F   Installation of Firewall.

            F   Installation of Engine Mount Hard points.

            F   Installation of Nose Gear hard points

            F   Assembly of center section spar.

 

       Note:   
                        1.     There is no fastbuild for the wings.


 

IF FLYING QUICKLY IS YOUR GOAL, 

THE FAST BUILD OPTION IS FOR YOU!

 

 

Contact us for updated pricing of fastbuild version:
info@pulsaraircraft.com